Fostering and Leveraging Opportunities for Water Security in Kosovo (FLOWS)


This project aims to improve the accountability of responsible institutions on enhancing and safeguarding water security in the country in line with the Kosovo Government priorities. Through a contribution to the World Bank, it focuses on supporting relevant authorities on providing sustainable access to water for socio-economic development, preserving the environment, and building resilience against climate shocks, through enhanced policy making, capacity building and innovative approaches.

Región/País Tema Período Presupuesto
Kosovo
Cambio climático y medio ambiente
Agua
nothemedefined
Reducción de riesgos de catástrofes
Seguridad y diplomacia del agua
Abastecimiento de agua
01.07.2022 - 30.06.2026
CHF  5’500’000
Contexto By regional comparison Kosovo is a water stressed country, and it has among the lowest levels of water storage capacity. As a consequence the mismatch of water demand and supply is expected to increase. The country already experiences a water crisis, and reservoir safety is urgent and overdue. Recent floods and the long-lasting drought that started in the summer of 2019 made infrastructure investments in Kosovo’s water resources sector even more pressing. Without immediate responses, the most arid area of Kosovo will be soon without water for drinking and sanitation services.
Objetivos Improving Kosovo’s capacities to safeguard sustainable management and access to adequate quantity and quality of water for socio-economic development, thus contributing to long-term water security and resilience to climate change impact.
Grupos destinarios

FLOWS will be supporting national level stakeholders, such as: Ministry of Environment, Spatial Planning and Infrastructure (MESP), River Basin District Authority (RBDA), Ministry of Agriculture, Rural Development and Forestry (MARFD) and Kosovo Environmental Protection Agency (KEPA) to improve the capacities of planning, identification and preparation of a list of prioritized investments in the area of water resources development conform to the EU Water Framework Directive (WFD). In addition, the Hydrometeorological Institute (HMI) will be supported to improve the quality of services, thus benefiting all citizens of Kosovo.

The Association of Kosovo Municipalities (AKM) and municipalities within the respective river basin area will be supported in the local implementation of policies. Furthermore, Regional Water Company (RWC) “Hidromorava” will be strengthened on Operation and Management (O&M) of water storage capacities and dam safety measures.

Communities through CSOs and different water user groups (including women groups) will be supported to articulate better the concerns of the population, in particular vulnerable groups and their water related demands.

Efectos a medio plazo

Outcome 1 (Institutions): Strengthening national capacities for managing Kosovo’s water security and Water Resources Investment Planning.

Outcome 2 (People): Improving water resources safety and availability in the Morava e Binçes basin.

Outcome 3 (Technology): Increasing resilience and reducing climate change impacts through innovative technologies and approaches.

Resultados

Resultados previstos:  

  • Hydrological, technical and economic analyses underlying water resources investment planning in the context of increasing drought and flood risks are updated and prepared
  • The national Water Resources Investment Preparation Study (WRIPS) is developed
  • A national level Strategic Environmental and Social Assessment (SESA) and assessment of scenarios for investment opportunities considering projected drought and flood impacts is drafted
  • Assessments and training for dam safety surveillance programs are developed
  • Investments in dam safety surveillance equipment to improve dam operation are made and safety management practices are applied
  • Assessment of innovative approaches (solar farming) to reduce climate change impacts on water body, protect water resources (lakes/reservoirs) and promote renewable energies generation is conducted
  • Pilot facilities of floating solar panels in the existing water storage capacities are built


Resultados de las fases anteriores:  

This is a new intervention through a contribution to a World Bank program which is complementary to the ongoing IWRM-K program. It responds to several root causes underpinning key water and climate change resilience sector challenges in Kosovo. With this intervention, SDC is shifting its focus directly towards the main portfolio objective related to water resource management and climate change. In its leading donor coordinator position of the water sector, Switzerland has gained a very rich experience and results in this sector since 2009.

The Government of Kosovo (GoK) has requested SDC to support the soft parts of this program, by providing technical assistance and working together with the WB and other partners.


Dirección / Officina Federal responsable COSUDE
Contrapartes del proyecto Contraparte del contrato
Institución financiera internacional (IFI)
  • Banco Mondial - Asociación Internacional de Fomento


Coordinación con otros proyectos y actores

SDC projects: Integrated Water Resources Management in Kosovo (IWRM-K) Program; Rural Water and Sanitation Support Programme (RWSSP) Phase VI

SECO projects: Urban Waste Water Treatment Plants (WWTP) in Gjakova and Peja; Corporate Development Support for Wastewater Sector in RWCs of Gjilan and Mitrovica; SDC Global Water Program and the Kosovo Environmental Program (KEP) funded by Sweden-SIDA

Presupuesto Fase en curso Presupuesto suizo CHF    5’500’000 Presupuesto actual suizo ya emitido CHF    2’375’000 Presupuesto inclusive contrapartes del proyecto CHF    35’640’000 Total del proyecto desde la primera fase Presupuesto suizo CHF   0 Presupuesto inclusive contrapartes del proyecto CHF   11’000’000
Fases del proyecto Fase 1 01.07.2022 - 30.06.2026   (Fase en curso)