Contribution to Rural Housing Reconstruction Project (RHRP)


Rural households affected by the earthquake of April 25, 2015, especially from disadvantaged groups, will rebuild earthquake resistant houses through the RHRP, the Government’s lead project for housing reconstruction. The Swiss support through a Multi-Donor Trust Fund managed by the World Bank, will enable an additional 2’250 rural households to rebuild. The contribution will be complemented by technical assistance secondments provided by SDC humanitarian aid.

Región/País Tema Período Presupuesto
Nepal
Asistencia humanitaria y RRC
Otro
nothemedefined
Vivienda (till 2016)
Ayuda y servicios materiales de emergencia
Rehabilitación de emergencia
Reconstrucción y rehabilitación (till 2016)
Eficacia humanitaria
Sector not specified
15.12.2015 - 30.06.2025
CHF  5’000’000
Contexto

On 25 April 2015, a 7.8 magnitude earthquake (EQ) struck Nepal, followed by another earthquake on May 12th. More than 8,500 people were killed. About 490’000 houses were destroyed and 265’000 houses damaged to the extent to make them at least temporarily inhabitable, leaving around 3.2 million people homeless.
The Post-Disaster Needs Assessment (PDNA) carried out in June estimated a total reconstruction need of USD 6.5 billion, of which half or USD 3.2 billion is for the reconstruction of housing and human settlements.According to the division of labour emerging since the EQ, the World Bank will be the lead agency in private housing reconstruction.

Objetivos

The goal of the RHRP is to restore housing damaged during the 2015 earthquakes in Nepal using earthquake resistant building techniques, and materials, through an owner-driven approach, and improving long-term resilience and culture of safer and sustainable housing.

Grupos destinarios
  • Vulnerable affected households in the districts with strong Swiss presence.
  • Masons, artisans and unskilled construction labor.
  • Local government agencies and their staff.
Efectos a medio plazo
  1. Earthquake affected households, selected on the basis of socio-economic vulnerability and gender equity perspective, have the means to rebuild their homes based on earthquake safer construction standards, designs and construction practices.
  2. Construction artisans and homeowners are equipped with skills to construct earthquake safer housing units using local materials and traditional construction methods supported by relevant training and technical assistance.
  3. Government and programme stakeholders have strengthened their capacities in homeowner driven programme management, supervision, monitoring and grievance mechanisms with the support of aid actors experienced in similar programmes (Pakistan, Haiti, Sri Lanka).
Resultados

Resultados previstos:  

  • Homeowners of totally destroyed homes rebuild basic core houses through conditional cash based assistance integrating earthquake resistant techniques.
  • Masons and artisans receive proper training including earthquake resistant methods and techniques using local materials and resources.
  • Central and local level authorities establish effective and adapted programme management mechanisms to provide guidance to operational partners and ensure relevant programme oversight.


Resultados de las fases anteriores:  

This is a single phase project with no previous opening credit.


Dirección / Officina Federal responsable COSUDE
Crédito Cooperación al desarrollo
Contrapartes del proyecto Contraparte del contrato
Institución financiera internacional (IFI)
  • Other WB


Otras contrapartes

Local civil society organizations, communities and private sector actors.

Coordinación con otros proyectos y actores

Government Ministries and institutions, UN agencies, National and International NGOs and other development partners participating to the reconstruction efforts in Nepal.

Presupuesto Fase en curso Presupuesto suizo CHF    5’000’000 Presupuesto actual suizo ya emitido CHF    5’000’000
Fases del proyecto Fase 1 15.12.2015 - 30.06.2025   (Fase en curso)