Note: the texts under all the headings, with the exception of 'Results achieved', describe the situation before the start of the project.
Improving Warsaw Commuter Rail Services
The city of Warsaw is growing at a rapid pace. The need for maintenance, improvement and development of the public transport system in the city and the wider metropolitan area is apparent. This project aims at improving the efficiency, reliability, safety and comfort of passenger transport services on an important commuter railway line linking the city of Grodzisk Mazowiecki to the Warsaw city center.
Pays/région | Thème | Période | Budget |
---|---|---|---|
Pologne |
Protéger l’environnement
Transports publics
|
24.10.2009
- 28.02.2017 |
CHF 19’353’841
|
- Procurement of six modern electric traction train units
- Procurement and installation of Passenger Information and Monitoring System with 101 information panels.
- Track maintenance on a length of 16 km.
- Construction of up to 16 automatic level crossings with barrier systems.
- Six trains have been delivered and 101 passenger information and monitoring systems have been installed.
- The new rolling stock meets the modern traffic safety standards and is adjusted to the needs of disabled people. Higher frequencies and a reduction of travel time have been achieved on the railway line.
- Height level crossings were equipped with new Automatic Signalling System devices, and 25 km of railway lines underwent comprehensive repairs.
- According to surveys, the percentage rate of passengers satisfied with the quality of the service has increased by 25%.
- National Coordination Unit
- Polish Ministry of Regional Development
-
Thème transversal Le projet tient compte de l'environnement en tant que thème transversal.
Numéro de projet UX01006
Contexte |
The project contributes to the implementation of the Polish government's public transportation policy: It increases the share of public transport, connects sub-regional centers and establishes an effective and safe public transport system. |
Objectifs |
The goal of the project is to improve health and living conditions for the whole population in the covered region and to improve environmental conditions, particularly with regard to air quality, in the covered region. |
Groupes cibles |
The direct beneficiary is the Warsaw Commuter Rail Ltd. as the company receiving six new modern traction units and a state of the art Passenger Information and Monitoring System. Indirect beneficiaries are i) passengers benefitting from better connections, shorter travel times, higher comfort, better information and improved safety; ii) elderly and differently abled people benefitting from easy access to the new traction units; and iii) inhabitants of the south-western part of the Warsaw metropolitan area due to improved public transport services. |
Activités |
|
Résultats |
Résultats obtenus: |
Direction/office fédéral responsable |
SECO |
Crédit |
Contribution suisse à l'UE élargie |
Partenaire de projet |
Partenaire contractuel Partenaire de mise en œuvre Warsaw Commuter Rail Ltd. (WCR)
|
Budget | Phase en cours Budget de la Suisse CHF 19’353’841 Budget suisse déjà attribué CHF 19’215’788 |
Phases du projet |
Phase 3
22.10.2009
- 31.03.2017
(Completed)
Phase 2
24.10.2009
- 31.12.2016
(Completed)
Phase 1 24.10.2009 - 28.02.2017 (Completed) |