Note: the texts under all the headings, with the exception of 'Results achieved', describe the situation before the start of the project.
Treatment Plant for Domestic Septage and Industrial Waste in Vati, Limassol
The septage collected by tankers from overflowing absorption pits in some areas Limassol, was disposed in lagoons in Vati area, causing pollution of the water of the Polemidia Dam. The project is expected to close the existing septage reception area which negatively affected the quality of the water dam and the termination of the infiltration of untreated waste to the dam, and construct of a new treatment plant for the domestic septage, industrial waste surplus activated sludge and leachate from the rehabilitation of the uncontrolled landfill.
Paese/Regione | Tema | Periodo | Budget |
---|---|---|---|
Cipro |
Proteggere l’ambiente
Depurazione delle acque reflue
|
01.07.2012
- 13.06.2017 |
CHF 3’935’150
|
- Technical economic and environmental study in relation to the proposed plant has been approved
- Procurement, construction, installation for Domestic Septage, Industrial wastewater and surplus sludge completed
- National State Institute North
-
Settore in base alle categorie del Comitato di Aiuto allo sviluppo (DAC) dell'OCSE Unallocated / Unspecified
Sotto-Settore in base alle categorie del Comitato di Aiuto allo sviluppo (DAC) dell'OCSE Sectors not specified
Tipo di aiuto Contributo all'allargamento
Numero del progetto 7F08417
Contesto |
Since 1997 the main source of water in Cyprus are dams on rivers or storage basins that are structured with the objective to provide water for drinking or irrigation. |
Obiettivi |
The overall objective of the project is to observe the Water Framework Directive 2000/60/EC (WFD) through the achievement of a good water status for Polemidia Dam. The project is expected to close the existing septage reception area which negatively affected the quality of the water dam, the termination of the infiltration of untreated waste to the dam and the construction of a new treatment plant for the domestic septage, industrial waste surplus activated sludge and leachate from the rehabilitation of the uncontrolled landfill. |
Gruppi target |
Public agencies, Local authorities, the inhabitants and small industries of the area to be serviced by the treatment plant |
Attività |
The project finances the design, procurement of equipment, construction of civil works, installation, testing, commissioning and operation for one year as defects liability period of the Domestic Septage, Industrial wastewater and surplus sludge Treatment Plant in Vati area, North to Limassol. |
Risultati |
Risultati raggiunti: |
Direzione/Ufficio responsabile |
DSC |
Credito |
Contributo svizzero all'allargamento dell'UE |
Partner del progetto |
Partner contrattuale Instituzione statale straniera |
Budget | Fase in corso Budget Svizzera CHF 3’935’150 Budget svizzero attualmente già speso CHF 3’801’270 |
Fasi del progetto |
Fase 1 01.07.2012 - 13.06.2017 (Completed) |